Anyone can start here · Community point, Ward 1 canal-front, District 8, Ho Chi Minh City, Vietnam

Build a handwash station at a Ward 1 canal-front community point

Ward 1's canal-front housing cluster has no shared handwashing point near its community gathering area, a basic gap given how much daily contact residents have with canal-adjacent surfaces and shared market goods. Standard: WHO/UNICEF WASH guidance; SDG 6.2 (adequate sanitation and hygiene). Proof: Install photo + flow check Method (WHO/UNICEF WASH guidance; SDG 6.2 (adequate sanitation and hygiene).): 1. Confirm the host-approved location and water source. 2. Assemble the handwash station frame using hand tools. 3. Connect the water reservoir or tap line and test the flow. 4. Stock the station with soap and a simple use sign. 5. Photograph the finished station in use. Done when: Install photo + flow check

Where
Community point, Ward 1 canal-front, District 8, Ho Chi Minh City, Vietnam
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Install photo + flow check

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.