Anyone can start here · Storm drain, market road, Khlong Toei, Bangkok, Thailand

Stencil a 'drains to the canal' warning at a Khlong Toei storm drain

Storm drains along Khlong Toei's market road carry street runoff straight to the canal residents live beside, but nothing on the ground tells vendors and residents that dumping here reaches the water directly. A simple stencil closes that awareness gap. Standard: UN-Habitat urban water-awareness guidance; SDG 6.3 (improve water quality). Proof: Finished-stencil photo Method (UN-Habitat urban water-awareness guidance; SDG 6.3 (improve water quality).): 1. Confirm the host or district-approved drain location. 2. Clean the pavement surface around the drain grate. 3. Position the stencil template over the drain. 4. Apply the marking paint evenly through the stencil. 5. Photograph the finished stencil once dry. Done when: Finished-stencil photo

Where
Storm drain, market road, Khlong Toei, Bangkok, Thailand
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Finished-stencil photo

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.