intermediate work · Parish hall, Namirembe Cathedral, Kampala, Uganda

Seal the drafts found at Namirembe Cathedral's parish hall

The gaps mapped around the parish hall's doors and windows let in dust and cold air every service, driving up both discomfort and cleaning work. Sealing each gap with simple weatherstripping and caulk closes that loss. Standard: UN-Habitat energy-efficient housing guidance; SDG 7.3 Proof: before/after photo of each sealed gap Method (UN-Habitat energy-efficient housing guidance; SDG 7.3): 1. Confirm the priority gap list from the earlier survey with the parish host. 2. Clean each gap area before sealing. 3. Apply weatherstripping or caulk to each identified gap. 4. Test each sealed point by hand for remaining draft. 5. Photograph each sealed gap and log the date. Done when: before/after photo of each sealed gap

Where
Parish hall, Namirembe Cathedral, Kampala, Uganda
Pay
$240 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photo of each sealed gap

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75โ€“150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package โ€” this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors โ€” the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.