Anyone can start here · Public canyon-rim trail, Colonia Sánchez Taboada, Tijuana, Baja California 22203

Build low erosion steps on a well-used, gentle canyon-rim trail

The steepest sections that residents already use daily to reach the canyon rim wash into loose ruts after every rain, forcing people to scramble on unstable ground. Setting simple timber or stone steps into the already-graded, gentle sections of the trail gives people a stable foothold without disturbing the surrounding slope. This work is limited to established, moderate trail grades. Standard: UN-Habitat safe public-space guidance; SDG 11 (Sustainable Cities and Communities) Proof: Photo of the finished, stable steps Method (UN-Habitat safe public-space guidance; SDG 11 (Sustainable Cities and Communities)): 1. Confirm the trail section is an established route with a moderate, walkable grade. 2. Clear loose debris from the step locations. 3. Set timber or stone risers into the existing grade using hand tools only. 4. Backfill and tamp each step to lock it in place. 5. Photograph the finished steps and record the build date. Done when: Photo of the finished, stable steps

Where
Public canyon-rim trail, Colonia Sánchez Taboada, Tijuana, Baja California 22203
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished, stable steps

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Community-coordination hazard survey (documentation + coordination only; severity-tagged)

Bring

Steps

  1. 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard.
  2. 2. Photograph each hazard.
  3. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical).
  4. 4. Name the responsible handoff target (BID / city agency / utility).
  5. 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.