intermediate work · Courtyard, La Castellane, 13015 Marseille, France

Clear a dumped-debris pile from a La Castellane courtyard (2026-07-19)

The same courtyard, once logged, still has bulky waste blocking a stairwell entrance used daily by families with strollers and older residents. Standard: Municipal solid-waste management program + SDG 11.6. Proof: Before/after photo pair plus volume note Method (Municipal solid-waste management program + SDG 11.6.): 1. Sort the dumped material into what can be bagged/hauled versus anything hazardous-looking. 2. Bag and haul the safe bulky waste to the municipal transfer point or licensed collector the host names. 3. Sweep and clear the remaining loose debris. 4. Photograph the cleared site from the same vantage as the before photo. 5. Log the total volume removed. Done when: Before/after photo pair plus volume note

Where
Courtyard, La Castellane, 13015 Marseille, France
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photo pair plus volume note

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: SDG-aligned community needs identification + intake (programmatic 311 front door) — maps a named local ecological or social need to a specific SDG target, a real place, and an actionable protocol intake, using photo + GPS + community input + a named referral target

Bring

Steps

  1. 1. Navigate to the named location; confirm GPS is inside the posting radius; record the GPS waypoint.
  2. 2. Photograph the current state of the unmet need (the gap, the condition, the absence) with a clear timestamp — the photo must show what is missing or failing, not just a streetview-style shot.
  3. 3. Document the community impact: record at minimum one household or resident account of how the need affects daily life; note the population affected (households, block, facility) and the primary harm (health risk, access barrier, safety hazard, environmental degradation).
  4. 4. Map the need to a named SDG target: record the SDG number and target (e.g. SDG 11.7, SDG 6.1, SDG 2.1, SDG 11.1) and confirm the need matches the target's scope.
  5. 5. Identify the vertical lane the work belongs to: housing (renovation/healthy-home), food (provenance/delivery), water, urban-canopy, or the appropriate ecological lane — state which existing protocol work type would provision the solution.
  6. 6. Look up and record the named intake target — the specific program, agency, or case queue the need should be routed to (e.g. city work-order URL, federal program intake, lead service line replacement registry); document the current gap between the need and the intake.
  7. 7. Compile the intake record: GPS, photos, SDG tag, community impact note, vertical lane, named intake target, and any program reference numbers; sign it as the identifying worker.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.