Anyone can start here · Murchison Road corridor, Fayetteville, NC

Maintain the rain garden along Murchison Road (2026-07-20)

The new Murchison Road rain garden needs regular weeding and mulch top-off in its first year to keep functioning as designed. Standard: EPA Green Infrastructure Program, distributed stormwater capture Proof: Before/after photos plus a plant health log. Method (EPA Green Infrastructure Program, distributed stormwater capture): 1. Walk the rain garden at Murchison Road corridor, Fayetteville, NC and identify weeds versus the planted species. 2. Hand-pull weeds from the basin, keeping the planted root balls intact. 3. Clear any trash or sediment that has collected in the basin. 4. Top off mulch where it has washed thin. 5. Photograph the maintained garden and log the plants still healthy. Done when: Before/after photos plus a plant health log.

Where
Murchison Road corridor, Fayetteville, NC
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos plus a plant health log.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.