intermediate work · Reynolds Avenue, Chicora-Cherokee, North Charleston, SC
Build a rain garden along Reynolds Avenue
Street runoff on Reynolds Avenue in Chicora-Cherokee has nowhere to go before it reaches the already overloaded storm system, and a rain garden gives it somewhere to soak in first. Standard: EPA Green Infrastructure Program, distributed stormwater capture Proof: Before/after photos of the rain garden and runoff path. Method (EPA Green Infrastructure Program, distributed stormwater capture): 1. Mark out the rain garden footprint at Reynolds Avenue, Chicora-Cherokee, North Charleston, SC where runoff already collects. 2. Dig a shallow basin and set the soil aside for backfill. 3. Mix compost into the basin soil to improve infiltration. 4. Plant water-tolerant native plants in the basin and mulch around them. 5. Direct the downspout or runoff path into the basin and photograph the finished garden. Done when: Before/after photos of the rain garden and runoff path.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.