intermediate work · Wells Ave neighborhood center, Reno, NV

Swap the pad-mounted swamp cooler pads at the Wells Avenue neighborhood center

The same Wells Avenue center cools with a side-yard pad-mounted evaporative cooler whose pads are crusted with mineral scale from Reno's hard water, cutting cooling efficiency during the hot dry summer. Fresh pads restore even wetting and real cooling capacity ahead of the next hot season. This follows the door sealing as the next weatherization step for the same building. Standard: DOE Weatherization Assistance Program (WAP) Proof: Before and after photos of the pads plus the service date logged. Method (DOE Weatherization Assistance Program (WAP)): 1. Shut off the cooler and water line, then open the side panels of the pad-mounted or window-mounted unit. 2. Pull the old, mineral-crusted pads and hose out the basin and float valve. 3. Cut and set new pads to the exact frame size on all sides of the unit. 4. Restore water and power, run the unit, and check for even wetting across every pad. 5. Photograph the new pads in place and log the service date for next season. Done when: Before and after photos of the pads plus the service date logged.

Where
Wells Ave neighborhood center, Reno, NV
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before and after photos of the pads plus the service date logged.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–150 minutes. Method of record: Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify

Bring

Steps

  1. 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
  2. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
  3. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
  4. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
  5. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.