advanced work · Civic Center Dr community building, North Las Vegas, NV

Install a laundry-to-landscape greywater reuse line at the Civic Center Drive building (2026-07-20)

The community building's laundry line still sends rinse water straight to the sewer instead of the drought-tolerant landscape just outside, a missed water source in one of the driest metro areas in the country. This is the credentialed final step of the site's water efficiency sequence, giving the landscape a second water source. Standard: LBC Water Petal, Net Positive Water Imperative Proof: Photo of the finished diverter and outlet plus a leak check log. Method (LBC Water Petal, Net Positive Water Imperative): 1. Identify the laundry or sink drain line that will feed the reuse system. 2. Install the diverter valve so the line can switch between sewer and reuse. 3. Run the reuse line to a mulch basin or subsurface distribution point in the yard. 4. Test the diverter switch and check for leaks at every joint. 5. Photograph the finished system and log the fixtures it serves. Done when: Photo of the finished diverter and outlet plus a leak check log.

Where
Civic Center Dr community building, North Las Vegas, NV
Pay
$560 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished diverter and outlet plus a leak check log.

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.