Anyone can start here · St. Mark's Episcopal Church, 1908 Central Ave, Cheyenne, WY

Build a kitchen compost bin for St. Mark's Episcopal Church coffee hour and food pantry

St. Mark's runs a weekly coffee hour and a small food pantry that generate kitchen scraps with nowhere to go but the trash. The church has invited a simple compost bin by the hall entrance so those scraps become garden soil instead of landfill waste. Standard: USDA NRCS compost application practice, Code 336 Proof: Photo of the finished bin plus its location logged. Method (USDA NRCS compost application practice, Code 336): 1. Set the compost bin frame in the spot the host congregation has cleared. 2. Level the base and anchor the bin so it will not tip when full. 3. Add a starter layer of dry leaves or straw at the bottom. 4. Post simple written instructions for what can go in the bin at the kitchen or hall entrance. 5. Photograph the finished bin and log its location. Done when: Photo of the finished bin plus its location logged.

Where
St. Mark's Episcopal Church, 1908 Central Ave, Cheyenne, WY
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished bin plus its location logged.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.