Anyone can start here · St. Mark's Episcopal Church, 1908 Central Ave, Cheyenne, WY

Maintain the rain garden at St. Mark's Episcopal Church (2026-07-20)

The new rain garden at St. Mark's needs regular weeding and an inlet check so it keeps soaking in downspout water instead of silting up and failing. The church has asked for this as an ongoing part of caring for the churchyard. Standard: EPA Green Infrastructure program Proof: Photo of the maintained garden plus the visit date logged. Method (EPA Green Infrastructure program): 1. Walk the rain garden and pull weeds before they seed. 2. Check the inlet from the downspout is clear and directing water into the basin. 3. Refresh mulch where it has washed thin or away. 4. Check plants for dieback and note any that need replacing. 5. Photograph the maintained garden and log the visit. Done when: Photo of the maintained garden plus the visit date logged.

Where
St. Mark's Episcopal Church, 1908 Central Ave, Cheyenne, WY
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the maintained garden plus the visit date logged.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.