Anyone can start here · South Cheyenne schoolyard fence line, Cheyenne, WY

Water in the new windbreak planting at the south Cheyenne schoolyard (2026-07-20)

The new windbreak row at the south Cheyenne schoolyard needs regular deep watering through its first season on the exposed plains site before its roots can hold on their own. Skipping this step would lose the planting to the wind and heat it was meant to block. Standard: USDA NRCS soil health practice standard Proof: Photo of the watered planting row plus a log of plants watered. Method (USDA NRCS soil health practice standard): 1. Check each new planting for dry, cracked soil at the base. 2. Fill the water basin around each plant slowly so water soaks in instead of running off. 3. Check the drip line or hose bib feeding the row is not clogged or leaking. 4. Refresh the mulch ring around any plant where it has washed thin. 5. Log which plants were watered and photograph any plant showing stress. Done when: Photo of the watered planting row plus a log of plants watered.

Where
South Cheyenne schoolyard fence line, Cheyenne, WY
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the watered planting row plus a log of plants watered.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.