Anyone can start here · Community farm plot, edge of Great Falls, MT
Apply compost to the community farm plot outside Great Falls (2026-07-20)
Soil on the community farm plot has thin organic matter after years of continuous cropping, holding less water and needing more fertilizer than a healthy plot would. A compost application feeds the soil directly and follows the cover crop seeding on the same plot. Standard: USDA NRCS compost application practice, Code 336 Proof: Photo of the finished application plus square footage logged. Method (USDA NRCS compost application practice, Code 336): 1. Rake back any surface mulch to expose bare soil in the application area. 2. Spread finished compost evenly at a 1 to 2 inch layer across the area. 3. Work the compost lightly into the top few inches of soil with a rake or fork. 4. Replace the mulch layer on top once the compost is worked in. 5. Photograph the finished application and log square footage covered. Done when: Photo of the finished application plus square footage logged.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify
Bring
- finished compost meeting the quality spec (temperature-cured; STA/US Composting Council tested where available)
- spreader, wheelbarrow + rakes/shovels at garden scale
- camera + GPS + tape/bucket for rate calibration
- gloves + dust mask for dry material handling
Steps
- 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
- 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
- 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
- 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
- 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.
If it does not match the plan
- Compost not finished (hot, ammonia smell, recognizable feedstock) -> reject the load; immature compost harms the soil it should build.
- Rain forecast that would wash material to a drain before incorporation -> delay application.
- Application area drains directly to a waterway with no buffer -> route to the conservation planner for a setback plan first.
What counts as done
- Application record complete: source, quality doc, quantity, rate, area, GPS, date
- Depth-check photos at ≥3 points match the planned rate
- No compost in gutters/drains/waterways (site-perimeter photo)
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.