Anyone can start here · Lincoln Park recreation center, Grand Junction, CO
Install low-flow fixtures in the restrooms at the Lincoln Park recreation center
The Lincoln Park recreation center in Grand Junction still runs older high-flow fixtures in its public restrooms, a steady water draw in a high desert valley that depends on Colorado River water allocation. Low-flow fixtures cut that draw and start the site's water-efficiency sequence. Standard: LBC Water Petal, Net Positive Water Imperative Proof: Photo of each new fixture plus a written count of fixtures replaced. Method (LBC Water Petal, Net Positive Water Imperative): 1. Shut off the water supply at each fixture to be upgraded. 2. Remove the old showerhead, faucet aerator, or flush valve. 3. Thread on the new low-flow fixture and check the seal with a wrench snug, not overtightened. 4. Restore water and run each fixture to check for leaks and even flow. 5. Log the fixtures replaced and photograph the finished install. Done when: Photo of each new fixture plus a written count of fixtures replaced.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45โ90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit
Bring
- flow-rate measurement bag + timer
- toilet dye tablets
- moisture meter
- GPS / address
- camera
- tablet / data sheet
Steps
- 1. Confirm the address; get a staff escort; photograph each fixture group.
- 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
- 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
- 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
- 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
- 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
- 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.
If it does not match the plan
- Meter moving with all fixtures off AND active water damage (wet drywall, ceiling stain, pooling near electrical) -> STOP: possible electrical exposure; keep clear, route to a licensed plumber (and electrician if water contacts wiring). The agent documents, never opens walls.
- Suspected cross-connection / backflow risk (hose-bib, irrigation, boiler makeup) -> flag for a licensed plumber backflow test; potable-water contamination is a health hazard โ do not test-operate the connection.
- Toilet dye migrates into the bowl -> flag a leaking flapper/valve for repair.
- Meter moves with all fixtures off -> flag a hidden leak for investigation.
- Faucet > 2.2 gpm or showerhead > 2.0 gpm -> recommend a WaterSense upgrade.
- No electrical/gas work; documentation only โ flag suspected pipe damage, do not disassemble.
What counts as done
- Flow rate (gpm) recorded per fixture
- Toilet leak result + flush volume recorded per toilet
- Meter-with-all-off check recorded
- Ranked upgrade/repair measures + photos + address confirm
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.