advanced work · Irrigation headgate near the Vado colonia, Doña Ana County, NM
Repair the irrigation headgate serving fields near the Vado colonia (2026-07-20)
The headgate below the cleared ditch stretch near Vado has worn gate boards and a stiff lift mechanism, making it hard for the ditch association to set an even flow to the fields this colonia depends on for household gardens and small plots. Surface repair of the gate hardware, working from the bank only, follows the ditch clearing as the next step for this stretch. Standard: USDA NRCS EQIP irrigation efficiency practice Proof: Before and after photo of the headgate plus a working-gate check logged. Method (USDA NRCS EQIP irrigation efficiency practice): 1. Inspect the headgate boards, screw stem, and frame from the bank side for cracks, rot, or seized hardware. 2. Clear debris and silt from the gate opening by hand from the bank, without entering the waterway. 3. Replace worn gate boards or hardware and grease the lift screw or wheel mechanism. 4. Patch any spalled concrete on the headgate apron with patch compound. 5. Test the gate opens and closes smoothly and photograph the finished repair. Done when: Before and after photo of the headgate plus a working-gate check logged.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit
Bring
- matched catch cans (or cups)
- measuring cylinder / ruler
- pressure gauge
- stopwatch
- GPS phone
- camera
- data sheet
Steps
- 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
- 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
- 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
- 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
- 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
- 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
- 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.
If it does not match the plan
- Low-quarter DU < 0.65 (sprinkler) -> flag poor uniformity for repair/redesign.
- Visible runoff or overspray onto pavement -> flag schedule/head correction.
- Emitter clogging or line leaks (drip) -> flag maintenance.
- Broken/misaligned head -> flag for repair. Documentation only; no repairs by surveyor.
What counts as done
- Distribution uniformity (or drip emitter-flow) recorded
- Operating pressure recorded
- Broken/leaking components + overspray noted
- Schedule-vs-need note + ranked fixes + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.