Weatherstrip the entry doors at the senior center on Santa Fe Avenue in Grants

The senior center on Santa Fe Avenue, downtown Grants, has torn weatherstrip on its main doors, leaking conditioned air in a high desert climate with cold winters and hot summers. New weatherstrip is the first step in the building's weatherization sequence. Standard: DOE Weatherization Assistance Program (WAP) Proof: Photo of each sealed door plus a written count of doors completed. Method (DOE Weatherization Assistance Program (WAP)): 1. Walk the exterior doors and note every gap, torn strip, or door that will not latch snug. 2. Measure each door frame and cut new weatherstrip and door-sweep material to fit. 3. Peel, press, and nail or screw the new weatherstrip and sweep into place, working one door at a time. 4. Close each door and check for daylight or draft around the full frame with a hand held up to the edge. 5. Photograph each finished door and log which doors were sealed. Done when: Photo of each sealed door plus a written count of doors completed.

Where
Santa Fe Ave senior center, Grants, NM
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each sealed door plus a written count of doors completed.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–150 minutes. Method of record: Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify

Bring

Steps

  1. 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
  2. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
  3. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
  4. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
  5. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.