Anyone can start here · 27 Penobscot Ave, Millinocket, ME 04462

Clear ground-reachable ice buildup on Penobscot Avenue homes in Millinocket (2026-07-20)

Homes along Penobscot Avenue in Millinocket regularly build up ice at the eave edge during the region's long, cold winters, and last season's ice pushed meltwater back under the shingles on one house. The homeowner needs the ground-reachable eave and gutter run cleared before it happens again. Standard: Efficiency Maine / NEEP cold-climate weatherization guidance Proof: Photo of the cleared eave edge plus a GPS tag and date log. Method (Efficiency Maine / NEEP cold-climate weatherization guidance): 1. Clear snow buildup from the ground-reachable eave edge with a roof rake. 2. Check the gutter for ice blockage and clear it if reachable from the ground. 3. Note any ice buildup that needs a longer-handled tool or a licensed crew. 4. Confirm the downspout below is clear so meltwater can drain. 5. Photograph the cleared eave edge and log the date. Done when: Photo of the cleared eave edge plus a GPS tag and date log.

Where
27 Penobscot Ave, Millinocket, ME 04462
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the cleared eave edge plus a GPS tag and date log.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Ohio Development Services Agency Home Weatherization Assistance Program (HWAP) — the state pass-through of the DOE Weatherization Assistance Program's cold-climate field protocol: blower-door-directed air sealing toward a CFM50 infiltration target, attic insulation to R-49 / wall cavity to R-13, and mandatory pre/post combustion-safety testing before any tightening closes out.

Bring

Steps

  1. 1. Walk the home with the occupant, note every combustion appliance present, and photograph each nameplate before any work begins.
  2. 2. Set up the calibrated blower door in the main entry and record the baseline CFM50 reading.
  3. 3. Trace and photograph the top infiltration paths with a smoke pencil (rim joist, attic hatch, penetrations, window/door perimeters).
  4. 4. Run the pre-tightening combustion-safety check (ambient CO reading, spillage test at draft hoods) with the blower door off; a failed check stops the job and routes to a licensed HVAC technician before any sealing.
  5. 5. Air-seal the ranked leak paths in order and bring attic insulation to R-49 / accessible wall cavity to R-13 per the HWAP job sheet, maintaining required soffit-to-ridge ventilation.
  6. 6. Re-run the blower-door test to confirm the new CFM50 result.
  7. 7. Run the mandatory post-tightening combustion-safety re-test; a failed re-test stops the job and routes to a licensed HVAC technician for venting correction before further sealing.
  8. 8. Photograph the finished insulation depth and the passed post-tightening combustion-safety check; enter before/after CFM50, materials used, and the combustion-safety result into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.