intermediate work · 58 Kelley St, Manchester, NH 03102

Add attic insulation to the Kelley Street triple-decker on Manchester's West Side

The same Kelley Street triple-decker has thin, settled attic insulation above the top-floor unit. This is the intermediate rung of the weatherization craft series, building on the sealing work already done. Standard: DOE Weatherization Assistance Program envelope-measures standard Proof: Photo of the finished insulation depth against a measuring stick plus a GPS tag. Method (DOE Weatherization Assistance Program envelope-measures standard): 1. Inspect the attic and measure the current insulation depth. 2. Air-seal any visible bypasses before adding insulation. 3. Install baffles at the eaves to keep soffit vents clear. 4. Add insulation across the attic floor to the target depth. 5. Photograph the finished depth against a measuring stick as proof. Done when: Photo of the finished insulation depth against a measuring stick plus a GPS tag.

Where
58 Kelley St, Manchester, NH 03102
Pay
$340 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished insulation depth against a measuring stick plus a GPS tag.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–150 minutes. Method of record: Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify

Bring

Steps

  1. 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
  2. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
  3. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
  4. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
  5. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.