Anyone can start here · 178 North Main St, Barre, VT 05641

Build a community compost hub at a North Main Street garden in Barre (2026-07-20)

A community garden on North Main Street in Barre collects vegetable scraps informally in open buckets that attract pests. The garden group wants a proper compost hub built with signage so the whole neighborhood can use it. Standard: USDA NRCS soil health compost-application practice standard Proof: Photo of the finished hub and signage plus a GPS tag and first-collection log. Method (USDA NRCS soil health compost-application practice standard): 1. Confirm the hub location with the host site. 2. Assemble or build the compost bin structure. 3. Post signage on what materials are accepted. 4. Load the first batch of browns and greens to start the pile. 5. Photograph the finished hub and log the first collection. Done when: Photo of the finished hub and signage plus a GPS tag and first-collection log.

Where
178 North Main St, Barre, VT 05641
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished hub and signage plus a GPS tag and first-collection log.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.