intermediate work · Westminster St, Providence, RI 02909

Install a storm drain filter insert on Westminster Street in Olneyville, Providence (2026-07-20)

The storm drain on Westminster Street in Olneyville carries road grit straight toward the Woonasquatucket River with no filtering. The city wants an insert installed to catch sediment before it reaches the water. Standard: EPA Green Infrastructure program standard Proof: Photo of the installed filter insert plus a GPS tag. Method (EPA Green Infrastructure program standard): 1. Clear leaves, trash, and sediment from the grate and inlet by hand. 2. Measure the inlet opening for the correct filter insert size. 3. Install the filter insert and seat it securely under the grate. 4. Confirm the drain still flows freely with a test pour of water. 5. Photograph the installed insert and log the inlet location. Done when: Photo of the installed filter insert plus a GPS tag.

Where
Westminster St, Providence, RI 02909
Pay
$280 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the installed filter insert plus a GPS tag.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.