Install storm window panels on an East Side triple-decker in Bridgeport (2026-07-20)

A triple-decker on Bridgeport's East Side has single-pane original windows with no storm panels, leaving the units cold and drafty through the winter. The landlord wants ground-reachable storm panels installed. Standard: Efficiency Maine / NEEP cold-climate weatherization guidance Proof: Photos of the installed panel from inside and outside plus a GPS tag. Method (Efficiency Maine / NEEP cold-climate weatherization guidance): 1. Measure each window opening for the storm panel size. 2. Clean the window frame before installing the panel. 3. Set the storm panel into the frame track or clips. 4. Seal any remaining gap around the panel edge. 5. Photograph the installed panel from inside and outside. Done when: Photos of the installed panel from inside and outside plus a GPS tag.

Where
88 East Main St, Bridgeport, CT 06608
Pay
$240 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos of the installed panel from inside and outside plus a GPS tag.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Ohio Development Services Agency Home Weatherization Assistance Program (HWAP) — the state pass-through of the DOE Weatherization Assistance Program's cold-climate field protocol: blower-door-directed air sealing toward a CFM50 infiltration target, attic insulation to R-49 / wall cavity to R-13, and mandatory pre/post combustion-safety testing before any tightening closes out.

Bring

Steps

  1. 1. Walk the home with the occupant, note every combustion appliance present, and photograph each nameplate before any work begins.
  2. 2. Set up the calibrated blower door in the main entry and record the baseline CFM50 reading.
  3. 3. Trace and photograph the top infiltration paths with a smoke pencil (rim joist, attic hatch, penetrations, window/door perimeters).
  4. 4. Run the pre-tightening combustion-safety check (ambient CO reading, spillage test at draft hoods) with the blower door off; a failed check stops the job and routes to a licensed HVAC technician before any sealing.
  5. 5. Air-seal the ranked leak paths in order and bring attic insulation to R-49 / accessible wall cavity to R-13 per the HWAP job sheet, maintaining required soffit-to-ridge ventilation.
  6. 6. Re-run the blower-door test to confirm the new CFM50 result.
  7. 7. Run the mandatory post-tightening combustion-safety re-test; a failed re-test stops the job and routes to a licensed HVAC technician for venting correction before further sealing.
  8. 8. Photograph the finished insulation depth and the passed post-tightening combustion-safety check; enter before/after CFM50, materials used, and the combustion-safety result into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.