Anyone can start here · Vine St community farm, Hartford, CT 06120

Apply compost at a North End community farm on Vine Street in Hartford (2026-07-20)

A community farm on Vine Street in Hartford's North End needs a fresh compost application worked into its growing beds ahead of the next planting cycle to keep the soil productive. Standard: USDA NRCS soil health principles Proof: Photo of the treated area plus a GPS tag and compost volume log. Method (USDA NRCS soil health principles): 1. Confirm the target bed or field area with the host. 2. Spread the compost evenly across the marked area at the recommended depth. 3. Work the compost lightly into the top few inches of soil. 4. Water the area to help the compost settle. 5. Photograph the finished area and log the compost volume applied. Done when: Photo of the treated area plus a GPS tag and compost volume log.

Where
Vine St community farm, Hartford, CT 06120
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the treated area plus a GPS tag and compost volume log.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.