Spread finished compost on the Alton Park community garden beds (2026-07-20)
The community garden beds on Alton Park Blvd have thin, worn soil from years of use without amendment, and yields have dropped as a result. A season of finished compost worked into the beds restores what has been used up. Standard: USDA NRCS soil health management, organic matter amendment Proof: Photo of amended beds with GPS tag and compost volume logged Method (USDA NRCS soil health management, organic matter amendment): 1. Test the current bed soil by hand for texture and moisture 2. Spread a measured layer of finished compost over each bed 3. Work the compost into the top few inches of soil 4. Water the beds after amendment 5. Photograph the finished beds and log the amount applied Done when: Photo of amended beds with GPS tag and compost volume logged
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify
Bring
- finished compost meeting the quality spec (temperature-cured; STA/US Composting Council tested where available)
- spreader, wheelbarrow + rakes/shovels at garden scale
- camera + GPS + tape/bucket for rate calibration
- gloves + dust mask for dry material handling
Steps
- 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
- 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
- 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
- 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
- 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.
If it does not match the plan
- Compost not finished (hot, ammonia smell, recognizable feedstock) -> reject the load; immature compost harms the soil it should build.
- Rain forecast that would wash material to a drain before incorporation -> delay application.
- Application area drains directly to a waterway with no buffer -> route to the conservation planner for a setback plan first.
What counts as done
- Application record complete: source, quality doc, quantity, rate, area, GPS, date
- Depth-check photos at ≥3 points match the planned rate
- No compost in gutters/drains/waterways (site-perimeter photo)
Proof is measured against these, not judged by taste.