intermediate work · Alton Park Blvd at W 40th St, Chattanooga, TN

Rebuild the broken curb ramp at Alton Park Blvd and W 40th Street (2026-07-20)

The curb ramp at Alton Park Blvd and W 40th Street has crumbled to a lip that catches wheelchairs and walkers, cutting off a direct crossing older residents rely on to reach the bus stop. Rebuilding it to a smooth grade restores that route. Standard: ADA curb ramp standard, accessible crossing for older residents Proof: Photo of the finished ramp with a slope measurement logged Method (ADA curb ramp standard, accessible crossing for older residents): 1. Mark the ramp footprint and confirm the required slope 2. Break out the crumbled ramp surface 3. Form and pour a new ramp section to ADA slope 4. Cure the new surface and add detectable warning texture 5. Photograph the finished ramp and log the slope measurement Done when: Photo of the finished ramp with a slope measurement logged

Where
Alton Park Blvd at W 40th St, Chattanooga, TN
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the finished ramp with a slope measurement logged

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 240–600 minutes. Method of record: Curb ramp repair/retrofit to ADA + PROWAG R304 (slope, landing, detectable warning surface), under municipal right-of-way permit — trained crew with wet-cut dust controls; assess→repair→verify

Bring

Steps

  1. 1. ASSESS: measure the existing ramp against PROWAG R304 (running slope ≤8.3%, cross-slope ≤2%, landing, flush transition, detectable warning) and photograph each failure; confirm permit + utility locates before cutting.
  2. 2. Set up cones/barricades and a safe pedestrian detour outside the work zone.
  3. 3. Remove the failed ramp section with wet-cut dust controls; form and place the corrected ramp geometry per the city standard drawing.
  4. 4. Set the detectable warning surface (truncated domes) aligned and embedded per spec; finish transitions flush with the gutter.
  5. 5. VERIFY: re-measure every R304 dimension with the smart level, photograph readings + before/after from matching vantage, water-test the gutter flow line, and close out the permit.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.