Anyone can start here · Downtown Anniston, AL

Mark the storm drains near downtown Anniston so they lead back to the creek (2026-07-20)

Storm drains near downtown Anniston feed into local streams with no marker reminding anyone that what goes in the gutter travels straight downstream. A painted stencil at each drain closes that information gap. Standard: EPA Urban Waters Federal Partnership, storm drain public-education marking Proof: Photo of each painted stencil with GPS tag, count logged Method (EPA Urban Waters Federal Partnership, storm drain public-education marking): 1. Walk the drain line downtown and list each drain inlet 2. Clean grime off the curb face so the stencil will hold 3. Lay the stencil template and roll on the marking paint 4. Let each mark dry before reopening the lane to foot traffic 5. Photograph and log every drain marked with its GPS point Done when: Photo of each painted stencil with GPS tag, count logged

Where
Downtown Anniston, AL
Pay
$150 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each painted stencil with GPS tag, count logged

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.