Anyone can start here · 410 Martin Luther King Jr St, Selma, AL

Weatherstrip the parish hall doors at Brown Chapel AME Church in Selma, with the congregation's welcome (2026-07-20)

The parish hall doors at Brown Chapel AME Church let outside air pour straight through worn seals, driving up heating and cooling costs for a congregation that already stretches every dollar to keep this landmark open. The church has invited the work; fresh weatherstripping on the hall doors closes the gap fast. Standard: DOE Weatherization Assistance Program, door air-sealing measure Proof: Photo of each sealed door with a draft test result, confirmed with the caretaker Method (DOE Weatherization Assistance Program, door air-sealing measure): 1. Confirm the work scope and doors with the church caretaker 2. Inspect the parish hall doors for worn or missing seals 3. Measure and cut new weatherstripping for each frame 4. Strip off the old, failed seal material and press the new weatherstripping into place 5. Photograph the finished doors and note the draft test result Done when: Photo of each sealed door with a draft test result, confirmed with the caretaker

Where
410 Martin Luther King Jr St, Selma, AL
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each sealed door with a draft test result, confirmed with the caretaker

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–120 minutes. Method of record: US DOE Weatherization Assistance Program DIY-safe air-sealing measures + ENERGY STAR DIY Guide to Sealing and Insulating. Occupant-safe caulk/weatherstrip work only; no combustion, electrical, insulation-removal, or pre-1978 paint disturbance.

Bring

Steps

  1. 1. Photograph each draft location (window trim, door, outlet, penetration) before sealing.
  2. 2. Confirm the home is post-1978 or the surfaces are lead-safe; if pre-1978 with disturbed paint, STOP and flag for a lead-safe pro.
  3. 3. Clean and dry each gap; remove old failed caulk/weatherstrip with the putty knife.
  4. 4. Apply a continuous caulk bead to fixed gaps (window/door trim, penetrations) and tool it smooth.
  5. 5. Install weatherstripping on operable window/door edges so it compresses without binding the sash/door.
  6. 6. Fit door sweeps to exterior doors and foam gaskets behind outlet/switch plates on exterior walls.
  7. 7. Verify each treated opening closes/latches and the seal is continuous; photograph the finished work.
  8. 8. Enter locations sealed, materials used, before/after photos, and any flagged hazard into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.