intermediate work · St. Mary's Cathedral parish hall restrooms, Grand Island, NE

Install Low-Flow Fixtures in the St. Mary's Cathedral Parish Hall Restrooms, Grand Island

Following the door sealing work, the parish hall restrooms at St. Mary's Cathedral still run older, high-flow faucets and fixtures that waste water on every use during the hall's frequent community meals. The parish has invited this next-phase fixture visit. Standard: EPA WaterSense program; LBC Water petal Proof: Photos show the sealed or insulated area complete, with homeowner sign-off logged. Method (EPA WaterSense program; LBC Water petal): 1. Confirm with the parish office that this host-invited visit is scheduled. 2. Shut off water supply to each fixture before starting. 3. Remove the existing high-flow faucet aerators and showerheads if present. 4. Install new low-flow aerators and fixtures. 5. Restore water supply, test flow, and log the fixtures installed. Done when: Photos show the sealed or insulated area complete, with homeowner sign-off logged.

Where
St. Mary's Cathedral parish hall restrooms, Grand Island, NE
Pay
$250 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos show the sealed or insulated area complete, with homeowner sign-off logged.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.