intermediate work · 766 N King St, Honolulu, HI

Install low-flow fixtures in the Kaumakapili Church kitchen and restrooms

Kaumakapili Church's kitchen and restroom fixtures are original and run far more water than needed for a building that hosts frequent community meals. The church invited a low-flow retrofit to cut the water bill and match its stewardship values. Standard: LBC Water petal, fixture efficiency Proof: Photos show installed low-flow fixtures with no leaks under water pressure Method (LBC Water petal, fixture efficiency): 1. Host-invited: confirm scope with the church facilities contact 2. Shut off water supply to each fixture before starting 3. Remove the existing aerator, showerhead, or fixture as needed 4. Install the new low-flow aerator or fixture and check for leaks 5. Restore water supply and confirm normal flow at each fixture Done when: Photos show installed low-flow fixtures with no leaks under water pressure

Where
766 N King St, Honolulu, HI
Pay
$250 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos show installed low-flow fixtures with no leaks under water pressure

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.