intermediate work · an ornamental date-palm grove at the edge of town, Desert Hot Springs, CA 92240

Repair an eroded flood-irrigation basin, palm 3 -- an ornamental date-palm grove at the edge of town, Desert Hot Springs, CA 92240

The audit found palm 3's flood-irrigation basin berm breached and eroded, letting water run off past the root zone instead of soaking in -- rebuilding the berm to spec per Mobile Irrigation Lab practice puts every gallon back where the tree can use it. Standard: Mobile Irrigation Lab distribution-uniformity practice applied to individual flood-irrigation basin/berm repair around desert-grown date palms; SDG 6.4/2.4 Proof: before/after photos + berm-height/compaction check + fill-time water-test + GPS Method (Mobile Irrigation Lab catch-can distribution-uniformity audit, ~60-120 min): 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro). 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can. 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths. 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks. 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement. 6. Review the run schedule against plant/soil need (over/under-watering, runoff). 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign. Equipment: matched catch cans (or cups), measuring cylinder / ruler, pressure gauge, stopwatch, GPS phone, camera, data sheet Done when: Distribution uniformity (or drip emitter-flow) recorded; Operating pressure recorded; Broken/leaking components + overspray noted; Schedule-vs-need note + ranked fixes + GPS + photos

Where
an ornamental date-palm grove at the edge of town, Desert Hot Springs, CA 92240
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + berm-height/compaction check + fill-time water-test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit

Bring

Steps

  1. 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
  2. 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
  3. 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
  4. 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
  5. 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
  6. 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
  7. 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.