advanced work · Bridge crane site, Pittsburgh PA

Check the crane setup and rigging at Bridge crane site, Pittsburgh PA before a lift (2026-07-21)

A crane lift at Bridge crane site, Pittsburgh PA risks power-line contact and tip-over if the setup is wrong. From a safe distance, check outrigger footing, power-line clearance, the barricaded swing zone, and the rigging condition, and route any unsafe lift to the lift director. Standard: OSHA 29 CFR 1926 Subpart CC — Cranes & Derricks in Construction (§§1926.1400–1442) Proof: photo from a safe distance per checklist section + GPS + Subpart CC checklist + power-line/outrigger/swing-zone/rigging status + tiered findings routed to the lift director Method (OSHA 29 CFR 1926 Subpart CC (Cranes & Derricks in Construction, §§1926.1400–1442) pre-lift spotter survey — safe-distance observation of setup, clearances, and rigging; documentation only, ~45-90 min): 1. Check in with the lift director / crane operator; confirm scope, don PPE, and confirm you observe-and-document from a safe distance only — you never rig, signal, level, or direct the lift (Subpart CC reserves these for the qualified rigger / signal person / operator). 2. Ground & setup: photograph and document firm/drained/level ground, full outrigger/stabilizer extension with pads/cribbing, and the crane's level indication (§§1926.1402/.1404). 3. Power-line clearance: identify overhead lines and confirm the planned swing/boom keeps the Table A minimum approach distance (default 20 ft for lines ≤350 kV) or that a documented de-energize / encroachment-prevention plan is in place (§1926.1408). 4. Swing radius / crush zone: confirm the area swept by the rotating superstructure (counterweight) is barricaded to keep workers out (§1926.1424). 5. Personnel & rigging: confirm a qualified signal person + an agreed signal method, a qualified rigger, the load chart / rated capacity posted, and slings/shackles/hooks (with safety latches) in serviceable condition per the rigger's inspection (§§1926.1419/.1425/.1428). 6. For each finding, mark the condition against the Subpart CC checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible lift director / qualified operator. 7. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the lift director / operator with a timestamp — never direct or signal the lift. Equipment: hard hat + safety glasses + hi-vis vest (site PPE), tablet/clipboard with the OSHA Subpart CC pre-lift checklist, camera with zoom (observe from a safe distance), tape measure / measuring wheel (setback and barricade distances from the ground), the crane's load chart / lift plan for reference, flashlight Done when: Ground/outrigger setup (firm/level, full extension, pads/cribbing) photographed and documented; Power-line minimum-approach clearance and swing-radius/crush-zone barricading confirmed and photographed; Qualified signal person + qualified rigger + posted load chart + serviceable rigging (safety latches) documented; Every finding tiered with the lift director / qualified operator named; stop-work items routed with a timestamp

Where
Bridge crane site, Pittsburgh PA
Pay
$540 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo from a safe distance per checklist section + GPS + Subpart CC checklist + power-line/outrigger/swing-zone/rigging status + tiered findings routed to the lift director

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-07-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: OSHA 29 CFR 1926 Subpart CC (Cranes & Derricks in Construction, §§1926.1400–1442) pre-lift spotter survey — safe-distance observation of setup, clearances, and rigging; documentation only

Bring

Steps

  1. 1. Check in with the lift director / crane operator; confirm scope, don PPE, and confirm you observe-and-document from a safe distance only — you never rig, signal, level, or direct the lift (Subpart CC reserves these for the qualified rigger / signal person / operator).
  2. 2. Ground & setup: photograph and document firm/drained/level ground, full outrigger/stabilizer extension with pads/cribbing, and the crane's level indication (§§1926.1402/.1404).
  3. 3. Power-line clearance: identify overhead lines and confirm the planned swing/boom keeps the Table A minimum approach distance (default 20 ft for lines ≤350 kV) or that a documented de-energize / encroachment-prevention plan is in place (§1926.1408).
  4. 4. Swing radius / crush zone: confirm the area swept by the rotating superstructure (counterweight) is barricaded to keep workers out (§1926.1424).
  5. 5. Personnel & rigging: confirm a qualified signal person + an agreed signal method, a qualified rigger, the load chart / rated capacity posted, and slings/shackles/hooks (with safety latches) in serviceable condition per the rigger's inspection (§§1926.1419/.1425/.1428).
  6. 6. For each finding, mark the condition against the Subpart CC checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible lift director / qualified operator.
  7. 7. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the lift director / operator with a timestamp — never direct or signal the lift.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.