Anyone can start here · School addition jobsite, Sacramento CA

Do a pre-work safety walk at the School addition jobsite, Sacramento CA jobsite (2026-07-21)

Before crews work at the School addition jobsite, Sacramento CA jobsite, someone should walk it for fall, electrical, and struck-by hazards. Do the walk and flag what must be fixed first. Standard: OSHA 1926 Subparts M/L/X/K/C pre-task jobsite safety walk Proof: Photos of each hazard area + Fall-protection and edge observations + Electrical and struck-by hazard notes + date Method (OSHA 1926 pre-task jobsite safety walk (Subparts M fall protection / L+X scaffolds+ladders / K electrical / C housekeeping), ~45-90 min): 1. Check in with the site's competent person; confirm scope, don required PPE, and confirm you observe-and-document only โ€” no trade work, no entry into active hazard zones. 2. Walk the fall-exposure perimeter: photograph unprotected edges/openings 6 ft or greater, guardrail/cover condition, and any personal fall arrest anchorage in use (Subpart M). 3. Inspect scaffold and ladder condition: base/plumb/tie-in, planking, guardrails; ladder pitch (~4:1), footing, tie-off, and 3-ft landing extension (Subparts L/X). 4. Screen temporary electrical: cord condition, GFCI presence, panel access clearance; test accessible GFCI outlets with the tester and record trip/no-trip (Subpart K). 5. Record housekeeping and access/egress: trip/impalement hazards, material storage, walkways, and clear exit paths (Subpart C). 6. For each finding, mark condition against the OSHA 1926 checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person. 7. Enter photos, GPS/address, checklist results, the GFCI test log, and the tiered findings list; sign. Route stop-work items to the competent person with a timestamp. Equipment: hard hat + safety glasses + hi-vis vest (site PPE), tablet/clipboard with the OSHA 1926 pre-task checklist, camera, GFCI outlet tester, tape measure, flashlight Done when: Fall-exposure, scaffold/ladder, temporary-electrical, and housekeeping sections each completed with photos; GFCI test log recorded (outlet ID + trip/no-trip) for accessible temporary circuits; Every finding tiered (stop-work / correct-before-proceed / monitor) with the responsible competent person named; Stop-work items routed to the competent person with a timestamp

Where
School addition jobsite, Sacramento CA
Pay
$480 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos of each hazard area + Fall-protection and edge observations + Electrical and struck-by hazard notes + date

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: OSHA 1926 pre-task jobsite safety walk (Subparts M fall protection / L+X scaffolds+ladders / K electrical / C housekeeping)

Bring

Steps

  1. 1. Check in with the site's competent person; confirm scope, don required PPE, and confirm you observe-and-document only โ€” no trade work, no entry into active hazard zones.
  2. 2. Walk the fall-exposure perimeter: photograph unprotected edges/openings 6 ft or greater, guardrail/cover condition, and any personal fall arrest anchorage in use (Subpart M).
  3. 3. Inspect scaffold and ladder condition: base/plumb/tie-in, planking, guardrails; ladder pitch (~4:1), footing, tie-off, and 3-ft landing extension (Subparts L/X).
  4. 4. Screen temporary electrical: cord condition, GFCI presence, panel access clearance; test accessible GFCI outlets with the tester and record trip/no-trip (Subpart K).
  5. 5. Record housekeeping and access/egress: trip/impalement hazards, material storage, walkways, and clear exit paths (Subpart C).
  6. 6. For each finding, mark condition against the OSHA 1926 checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person.
  7. 7. Enter photos, GPS/address, checklist results, the GFCI test log, and the tiered findings list; sign. Route stop-work items to the competent person with a timestamp.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.