Confined-space entry pre-screen — utility vault, Cleveland (2026-07-21)

A crew is preparing to enter a below-grade utility vault in Cleveland without documented atmospheric testing, permit, or rescue plan. Standard: OSHA 29 CFR 1926 Subpart AA — Confined Spaces in Construction (§§1926.1200–1213) Proof: photo from outside per checklist section + GPS + Subpart AA checklist + permit/atmospheric-log/attendant/rescue status + tiered findings routed to the entry supervisor Method (OSHA 29 CFR 1926 Subpart AA (Confined Spaces in Construction, §§1926.1200–1213) entry pre-screen — outside-the-space observation only, ~45-90 min): 1. Check in with the entry supervisor; confirm scope, don site PPE, and confirm you observe-and-document from OUTSIDE the space only — you never enter, never perform in-space atmospheric testing, and never authorize entry (Subpart AA reserves these for the entry supervisor / authorized entrant). 2. Classify the space with the entry supervisor: permit-required (a potential hazardous atmosphere, engulfment, entrapment/converging walls, or another serious hazard) or non-permit; photograph the space from outside and record the classification (§1926.1203). 3. For a permit-required space, confirm a completed entry permit is posted: authorized entrant(s), attendant, and entry supervisor named; hazards, controls, acceptable entry conditions, and permit duration recorded (§1926.1206). 4. Document the atmospheric-testing log: pre-entry and continuous readings for oxygen (19.5–23.5%), flammables (<10% LEL), and toxics (e.g., H2S, CO); confirm a calibrated meter and who performed the test — you record the log, you never test inside the space (§1926.1204). 5. Confirm the attendant is stationed outside with continuous entrant communication, and that a rescue plan / non-entry retrieval (harness + lifeline) plus an emergency-service arrangement is in place (§§1926.1209–1211). 6. For each finding, mark the condition against the Subpart AA checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible entry supervisor. 7. Enter photos (from outside), GPS/address, the checklist, the permit + atmospheric-log status, and the tiered findings; sign. Route stop-work items to the entry supervisor with a timestamp — never enter or authorize entry. Equipment: hard hat + safety glasses + hi-vis vest (site PPE), tablet/clipboard with the OSHA 1926 Subpart AA entry-permit pre-screen checklist, camera, tape measure, flashlight, stand-back / cordon reference to keep clear of the opening Done when: Space classified (permit-required vs non-permit) with the entry supervisor and photographed from outside; Entry-permit status documented for a permit-required space (entrant / attendant / entry supervisor named, hazards + acceptable conditions + duration); Atmospheric-testing log status recorded (O2 / LEL / toxics, pre-entry + continuous, calibrated meter, tester named); Attendant + rescue/retrieval + emergency-service arrangement confirmed; every finding tiered with the entry supervisor named and stop-work items routed with a timestamp

Where
Utility vault, Cleveland OH
Pay
$548 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo from outside per checklist section + GPS + Subpart AA checklist + permit/atmospheric-log/attendant/rescue status + tiered findings routed to the entry supervisor

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-07-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: OSHA 29 CFR 1926 Subpart AA (Confined Spaces in Construction, §§1926.1200–1213) entry pre-screen — outside-the-space observation only

Bring

Steps

  1. 1. Check in with the entry supervisor; confirm scope, don site PPE, and confirm you observe-and-document from OUTSIDE the space only — you never enter, never perform in-space atmospheric testing, and never authorize entry (Subpart AA reserves these for the entry supervisor / authorized entrant).
  2. 2. Classify the space with the entry supervisor: permit-required (a potential hazardous atmosphere, engulfment, entrapment/converging walls, or another serious hazard) or non-permit; photograph the space from outside and record the classification (§1926.1203).
  3. 3. For a permit-required space, confirm a completed entry permit is posted: authorized entrant(s), attendant, and entry supervisor named; hazards, controls, acceptable entry conditions, and permit duration recorded (§1926.1206).
  4. 4. Document the atmospheric-testing log: pre-entry and continuous readings for oxygen (19.5–23.5%), flammables (<10% LEL), and toxics (e.g., H2S, CO); confirm a calibrated meter and who performed the test — you record the log, you never test inside the space (§1926.1204).
  5. 5. Confirm the attendant is stationed outside with continuous entrant communication, and that a rescue plan / non-entry retrieval (harness + lifeline) plus an emergency-service arrangement is in place (§§1926.1209–1211).
  6. 6. For each finding, mark the condition against the Subpart AA checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible entry supervisor.
  7. 7. Enter photos (from outside), GPS/address, the checklist, the permit + atmospheric-log status, and the tiered findings; sign. Route stop-work items to the entry supervisor with a timestamp — never enter or authorize entry.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.