advanced work · Residential retrofit site, Albuquerque NM

Electrification retrofit readiness survey — heat-pump + panel, Albuquerque (2026-07-21)

A household in Albuquerque wants to move off gas heat but has no idea whether the panel and insulation can support a heat pump. Standard: ASHRAE Level 1 practice + LBC Energy petal; NEC panel observation only (documentation, not a load calc) Proof: photo inventory (HVAC/water fuel+age, panel label, insulation) + GPS + panel amperage/spare-slot count + ranked heat-pump readiness list, all routed to licensed pros Method (Electrification retrofit readiness survey (ASHRAE Level 1 practice + LBC Energy petal; NEC panel observation only — documentation, not a load calc), ~60-120 min): 1. Confirm the address + scope with the owner/occupant and arrange access to the mechanical room, electrical panel, and attic/crawl. Observe-and-document only — no panel or HVAC work. 2. Inventory existing space + water heating: fuel (gas/electric/oil/propane), system type + age, ducted vs. ductless suitability, and any combustion appliance present (for later decommission planning by a pro). 3. Photograph the electrical panel label: main service amperage, panel make, and count of used vs. spare breaker slots; note obvious constraints (full panel, subpanels, aluminum branch wiring) — as inputs for a licensed electrician's load calc, NOT a load calc yourself. 4. Record the envelope/insulation baseline: attic/wall/floor insulation presence + approximate R-level where visible, and obvious air-leakage points; use IR imaging if available. 5. Assemble a heat-pump readiness summary: what a conversion would likely require (panel capacity, dedicated circuit, ducting/ductless, envelope improvements) as a ranked readiness list — framed as inputs for licensed pros, not a design. 6. Enter photos, GPS/address, the inventory, panel observations, insulation baseline, and the ranked readiness list; sign. Route panel/service and combustion-decommission questions to licensed pros. Equipment: tablet/clipboard with the readiness checklist, camera, tape measure, flashlight (panel/attic/crawl), note on existing HVAC + water-heating fuel and age, thermal/IR camera (optional, insulation scope) Done when: Existing heating/water-heating fuel + system type + age inventoried with photos; Electrical panel service amperage + used/spare breaker slots photographed and recorded (observation, not a load calc); Insulation/air-sealing baseline recorded (R-levels where visible); Ranked heat-pump readiness list produced as inputs for licensed pros

Where
Residential retrofit site, Albuquerque NM
Pay
$584 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo inventory (HVAC/water fuel+age, panel label, insulation) + GPS + panel amperage/spare-slot count + ranked heat-pump readiness list, all routed to licensed pros

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-07-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Electrification retrofit readiness survey (ASHRAE Level 1 practice + LBC Energy petal; NEC panel observation only — documentation, not a load calc)

Bring

Steps

  1. 1. Confirm the address + scope with the owner/occupant and arrange access to the mechanical room, electrical panel, and attic/crawl. Observe-and-document only — no panel or HVAC work.
  2. 2. Inventory existing space + water heating: fuel (gas/electric/oil/propane), system type + age, ducted vs. ductless suitability, and any combustion appliance present (for later decommission planning by a pro).
  3. 3. Photograph the electrical panel label: main service amperage, panel make, and count of used vs. spare breaker slots; note obvious constraints (full panel, subpanels, aluminum branch wiring) — as inputs for a licensed electrician's load calc, NOT a load calc yourself.
  4. 4. Record the envelope/insulation baseline: attic/wall/floor insulation presence + approximate R-level where visible, and obvious air-leakage points; use IR imaging if available.
  5. 5. Assemble a heat-pump readiness summary: what a conversion would likely require (panel capacity, dedicated circuit, ducting/ductless, envelope improvements) as a ranked readiness list — framed as inputs for licensed pros, not a design.
  6. 6. Enter photos, GPS/address, the inventory, panel observations, insulation baseline, and the ranked readiness list; sign. Route panel/service and combustion-decommission questions to licensed pros.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.