Anyone can start here · the hillslope above the Bald Rock Road rebuild corridor, Berry Creek, CA 95916

Document burned-hillslope erosion risk above the rebuild corridor, the Bald Rock Road rebuild corridor, Berry Creek, CA 95916

The 2020 Bear Fire stripped the hillside above this corridor of vegetation and left ash-and-mineral soil exposed to the Sierra foothill's heavy winter rains, and nobody has documented where that unstable burned ground is most likely to slide or gully onto the road below. Standard: USDA-NRCS Burned Area Emergency Response (BAER) hillslope erosion-risk documentation + contour-felled-log/straw-wattle/mulch barrier-installation practice; SDG 15.3/13 resilience. Proof: document-only photo set of the burned slope + GPS waypoints per erosion feature + ranked checklist Method (EPA dry-weather / AMD field screening, ~30-60 min): 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining. 2. Note whether flow is present in dry weather (yes/no). 3. Measure and record pH, conductivity, and each specified analyte per kit instructions. 4. Log any color, odor, floc, or aquatic-life observation. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign. Equipment: GPS phone, pH meter or strips, conductivity meter, ammonia + iron test kit as specified, surfactant screen if specified, gloves, camera Done when: pH + conductivity recorded with units; Each specified analyte recorded with a value; Dry-weather flow present? recorded yes/no; GPS waypoint + timestamped photo

Where
the hillslope above the Bald Rock Road rebuild corridor, Berry Creek, CA 95916
Pay
$130 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only photo set of the burned slope + GPS waypoints per erosion feature + ranked checklist

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-04

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.