Anyone can start here · the Allensworth Community Services District interim water-service area, Allensworth, CA 93219

Run the interim bottled-water delivery route, round 1 -- the Allensworth Community Services District interim water-service area, Allensworth, CA 93219 (2026-07-21)

Households along this route still rely on delivered bottled water while the new well and storage tank remain under construction; a standing weekly delivery keeps the interim supply reliable instead of ad hoc. Standard: EPA National Primary Drinking Water Regulations arsenic MCL (10 ug/L) + California SWRCB Title 22 + SAFER Drinking Water Program point-of-use/point-of-entry interim-treatment guidance for a priority disadvantaged community; SDG 6.1. Proof: delivery log (households served, cases delivered) + before/after supply-level photos + GPS Method (EPA WaterSense fixture flow-rate + leak audit, ~45-90 min): 1. Confirm the address; get a staff escort; photograph each fixture group. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm). 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak). 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign. Equipment: flow-rate measurement bag + timer, toilet dye tablets, moisture meter, GPS / address, camera, tablet / data sheet Done when: Flow rate (gpm) recorded per fixture; Toilet leak result + flush volume recorded per toilet; Meter-with-all-off check recorded; Ranked upgrade/repair measures + photos + address confirm

Where
the Allensworth Community Services District interim water-service area, Allensworth, CA 93219
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
delivery log (households served, cases delivered) + before/after supply-level photos + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.