advanced work · Nuestra Senora de la Paz Mission, Hwy 46 & Hwy 33, Blackwells Corner, Lost Hills, CA 93249

Top up the attic insulation at the mission hall, Nuestra Senora de la Paz Mission, Hwy 46 & Hwy 33, Blackwells Corner, Lost Hills, CA 93249

The mission hall's attic is insulated well below the target R-value for this Central Valley climate's extreme summer heat load, driving up cooling costs for services held through the hottest months of the year. Standard: DOE WAP field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing; LBC Energy petal Proof: before/after depth photos at 3+ points + baffles-clear photo + R-value calc + GPS Method (Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only), ~75-150 min): 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch). 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy). 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs. Equipment: camera, tape measure + flashlight (attic/crawl/basement/rim joist), low-cost CO monitor (spot screening at combustion appliances), incense stick or smoke pencil (qualitative draft tracing, no blower door), tablet/clipboard with the weatherization-readiness checklist, thermal/IR camera (optional, insulation-gap scope) Done when: Household comfort targets (cold rooms, drafts, bill pain) recorded and used to frame the package; Envelope inventoried by assembly (attic/wall/floor/rim + windows/doors) with photos and approximate R-levels where visible; Combustion appliances photographed with CO spot readings; every tightening-gate flag named for a BPI-qualified pro; Weatherization-readiness package delivered: ranked air-sealing targets, insulation gaps w/ rough quantities, moisture prerequisites, ventilation-after-tightening notes, and candidate utility/WAP program paths

Where
Nuestra Senora de la Paz Mission, Hwy 46 & Hwy 33, Blackwells Corner, Lost Hills, CA 93249
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after depth photos at 3+ points + baffles-clear photo + R-value calc + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-04

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.