advanced work · a residential cluster along the Road 168 / Avenue 144 corridor, Cotton Center, Poplar-Cotton Center, CA 93257

Install a solar streetlight at the flagged dark gap in the Cotton Center cluster, a residential cluster along the Road 168 / Avenue 144 corridor, Cotton Center, Poplar-Cotton Center, CA 93257

The survey flagged a genuinely dark residential segment with no fixture at all; a standalone solar-powered LED streetlight closes that gap without waiting on a grid-electrification project this far from Poplar's core service area. Standard: County/CSD public-right-of-way lighting practice + documented DUC infrastructure-gap framing (streetlights among the utilities disadvantaged unincorporated California communities commonly lack), applied to Poplar-Cotton Center, Tulare County; SDG 11.1/11.b. Proof: before/after photos + footing/pole-plumb confirm + solar-panel/battery function test + GPS Method (Community-coordination hazard survey (documentation + coordination only; severity-tagged), ~30-60 min): 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard. 2. Photograph each hazard. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical). 4. Name the responsible handoff target (BID / city agency / utility). 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign. Equipment: GPS phone, camera, hi-vis vest, severity-tag reference (minor|moderate|severe|critical) Done when: Each hazard photographed with a GPS waypoint; Severity tag assigned per hazard; Hazard type classified; Named handoff target per hazard

Where
a residential cluster along the Road 168 / Avenue 144 corridor, Cotton Center, Poplar-Cotton Center, CA 93257
Pay
$420 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + footing/pole-plumb confirm + solar-panel/battery function test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-07

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Community-coordination hazard survey (documentation + coordination only; severity-tagged)

Bring

Steps

  1. 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard.
  2. 2. Photograph each hazard.
  3. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical).
  4. 4. Name the responsible handoff target (BID / city agency / utility).
  5. 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.