Anyone can start here · the Mina Road corridor leading toward the North Fork Eel River, northeast of Covelo on the Round Valley Indian Reservation, Mendocino County, CA
Plant native bunchgrass in the cleared woodland understory, site 2 -- the Mina Road corridor leading toward the North Fork Eel River, northeast of Covelo on the Round Valley Indian Reservation, Mendocino County, CA
A second cleared segment along the corridor also has bare, disturbed soil that needs a native ground layer before winter rain erodes it down the slope. Standard: USDA-NRCS Soil Health assessment + native-cover restoration practice; SDG 15.3 land degradation neutrality. Proof: before/after photos + plug-count or broadcast-rate record + mulch confirm + GPS Method (USDA-NRCS soil-health in-situ assessment, ~45-90 min): 1. Navigate to the plot; record GPS; sketch the sampling layout. 2. Photograph each sampling station. 3. Run the infiltration ring; record time to infiltrate 1 inch. 4. Assess aggregate stability and note visible organic matter, roots, and biology. 5. If compaction is in scope, record penetrometer resistance by depth. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign. Equipment: soil auger or trowel, infiltration ring + measured water + timer, penetrometer (if compaction in scope), clean bucket, sample bags + labels, gloves, GPS phone, camera Done when: Infiltration time recorded; Aggregate stability + organic-matter observation recorded; Each in-scope measurement recorded with units and depth; GPS waypoint + station photos + site sketch
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment
Bring
- soil auger or trowel
- infiltration ring + measured water + timer
- penetrometer (if compaction in scope)
- clean bucket
- sample bags + labels
- gloves
- GPS phone
- camera
Steps
- 1. Navigate to the plot; record GPS; sketch the sampling layout.
- 2. Photograph each sampling station.
- 3. Run the infiltration ring; record time to infiltrate 1 inch.
- 4. Assess aggregate stability and note visible organic matter, roots, and biology.
- 5. If compaction is in scope, record penetrometer resistance by depth.
- 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
- 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.
If it does not match the plan
- Infiltration > 30 min/inch or high penetrometer resistance -> flag compaction; recommend cover crop / reduced traffic.
- Very low organic matter / no visible biology -> flag degraded; recommend amendment plan.
What counts as done
- Infiltration time recorded
- Aggregate stability + organic-matter observation recorded
- Each in-scope measurement recorded with units and depth
- GPS waypoint + station photos + site sketch
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.