Anyone can start here · Chamizal National Memorial, El Paso, TX
Hand-build a one-rock check dam in an eroding arroyo reach: Chamizal National Memorial, TX
Desert arroyos cut deeper with every storm, draining the water table and starving vegetation. A hand-placed one-rock dam slows the flow, catches sediment, and lets the channel heal. Site: Chamizal National Memorial, El Paso, TX. Standard: One-rock dam and Zuni bowl erosion control per Quivira Coalition 'Let the Water Do the Work'; surface rock placement only, no digging; SDG 15.3 Proof: before/after photos of the placed one-rock dam + GPS + rock course count Method (One-rock dam per Quivira Coalition practice: read the reach, place a single course of rock across the grade line, keyed by placement not digging, photo verify. Surface placement only., ~90-240 min): 1. Photo the eroding reach as found. 2. Choose the grade line per the one-rock dam pattern. 3. Place a single rock course, tight-fitted, surface only. 4. After photo + course count. Equipment: local rock on site (no imported material), work gloves, camera + GPS phone Done when: Single rock course placed across the grade line, tight-fitted, no digging; Course count and before/after photos from the same vantage + GPS; Local rock only, no imported material
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: One-rock dam per Quivira Coalition practice: read the reach, place a single course of rock across the grade line, keyed by placement not digging, photo verify. Surface placement only.
Bring
- local rock on site (no imported material)
- work gloves
- camera + GPS phone
Steps
- 1. Photo the eroding reach as found.
- 2. Choose the grade line per the one-rock dam pattern.
- 3. Place a single rock course, tight-fitted, surface only.
- 4. After photo + course count.
If it does not match the plan
- Rain in the forecast or water flowing: STOP, reschedule
- Bank cutting requires excavation to stabilize: STOP, route to a licensed contractor
- Rock requires more than a two-person lift: leave it, choose smaller material
What counts as done
- Single rock course placed across the grade line, tight-fitted, no digging
- Course count and before/after photos from the same vantage + GPS
- Local rock only, no imported material
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.