Document a public culvert crossing's condition on the Texas Ave corridor, site 1, Texas Ave and Roundbunch Rd corridor, Bridge City, TX 77611 (public right-of-way) (2026-07-24)

A public-road culvert crossing on this corridor shows signs of sediment buildup and no current photo record exists to prioritize it for the road department's maintenance list, in a flat-land, poor-drainage town that floods with every major storm. Standard: FEMA floodplain + green-infrastructure siting screen. SDG 11.5 disaster resilience. Proof: document-only stand-off photo log from the road shoulder + blockage-severity note + GPS + ranked follow-on note Method (FEMA floodplain + green-infrastructure siting screen. SDG 11.5 disaster resilience.): 1. 1. From the public road shoulder only, observe a public-road culvert crossing along the Texas Ave or Roundbunch Rd corridor for visible blockage (trash, sediment buildup, collapsed inlet) or standing water backed up against the road. 2. 2. Photograph the culvert's inlet and outlet ends from the shoulder, never entering the culvert vault or barrel or stepping into water. 3. 3. Note the apparent blockage type and severity, and whether the road surface shows signs of overtopping. 4. 4. Record a ranked follow-on note naming the crossing for the city or county road department's licensed culvert-maintenance crew. Done when: document-only stand-off photo log from the road shoulder + blockage-severity note + GPS + ranked follow-on note

Where
Texas Ave and Roundbunch Rd corridor, Bridge City, TX 77611 (public right-of-way)
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only stand-off photo log from the road shoulder + blockage-severity note + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-23

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.