Open WORK_1784861160459_9j9njow
Anyone can start here · Texas Ave and Roundbunch Rd corridor, Bridge City, TX 77611 (public right-of-way)
Document a public culvert crossing's condition on the Texas Ave corridor, site 2, Texas Ave and Roundbunch Rd corridor, Bridge City, TX 77611 (public right-of-way).
Fund it for $90. Proof lands onchain when it's done.
$90 proposed
Not funded yet. Settles as earned credit, $90 proposed.
- Proofdocument-only stand-off photo log from the road shoulder + blockage-severity note + GPS + ranked follow-on note
- Open until2026-10-23
- Levelentry
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $90
What the work involvesA public-road culvert crossing on this corridor shows signs of sediment buildup and no current photo record exists to prioritize it for the road department's maintenance list, in a flat-land, poor-drainage town that floods with every major storm.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. From the public road shoulder only, observe a public-road culvert crossing along the Texas Ave or Roundbunch Rd corridor for visible blockage (trash, sediment buildup, collapsed inlet) or standing water backed up against the road.
- 2. Photograph the culvert's inlet and outlet ends from the shoulder, never entering the culvert vault or barrel or stepping into water.
- 3. Note the apparent blockage type and severity, and whether the road surface shows signs of overtopping.
- 4. Record a ranked follow-on note naming the crossing for the city or county road department's licensed culvert-maintenance crew.
What counts as done
- Photos of the culvert inlet and outlet taken from the public road shoulder
- Blockage type and severity noted
- GPS waypoint confirming the observation point
- Ranked follow-on note naming the crossing for the road department's licensed maintenance crew
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784861160459_9j9njow","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.