Open WORK_1784861975542_mw0hn5g
Anyone can start here · public right-of-way desert-lot edge near the Pecos town limit along S Cedar Street (US 285), Pecos, TX 79772
Document oilfield-fenceline conditions from the public right-of-way near the Pecos town limit, site 1, public right-of-way desert-lot edge near the Pecos town limit along S Cedar Street (US 285), Pecos, TX 79772.
Fund it for $90. Proof lands onchain when it's done.
$90 proposed
Not funded yet. Settles as earned credit, $90 proposed.
- Proofdocument-only stand-off photo/video log from the public right-of-way + GPS + time/weather note + ranked follow-on note
- Open until2026-10-23
- Levelentry
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $90
What the work involvesAn oilfield lease fenceline visible from this public right-of-way desert-lot edge has no independent photo record of flaring, venting, or truck-route dust conditions, and no resident here is equipped or authorized to enter the lease itself.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- calibrated PM2.5 monitor
- GPS phone
- wind/weather note source
- hi-vis vest
- camera
Steps
- 1. Choose >=3 points (near-source/roadside, mid, background); record GPS at each; stay off the roadway.
- 2. Photograph each monitoring location.
- 3. Log PM2.5 (ug/m3) at each point over a comparable peak period.
- 4. Record wind direction, time, and nearby source activity (e.g., truck traffic).
- 5. Compare readings to the NAAQS reference.
- 6. Enter the PM2.5 logs, wind/time, source note, GPS, photos into the proof record; sign.
What counts as done
- Photo or short video of the visible flare, vent, or dust condition, taken from the public right-of-way only
- GPS waypoint confirming the observer stayed on public right-of-way, never entering the lease
- Time of day and weather/wind conditions noted
- Ranked follow-on note naming the observation for the appropriate regulatory or licensed-inspection follow-on
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784861975542_mw0hn5g","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.