Anyone can start here · Arena Cove & Pier, Point Arena, CA 95468
Set up a kitchen-scraps compost program at Pier Place, 790 Port Rd, Arena Cove & Pier, Point Arena, CA 95468 (2026-07-24)
The scorecard above found no diversion path for Pier Place's kitchen scraps -- every pound currently goes to the landfill bin instead of back into soil, the top-ranked shortfall the scorecard named. Standard: Michelin Green Star-style 7-criterion scorecard (sourcing, waste, energy, water, procurement, seasonality, team). Proof: before/after photos + bin-setup record + first-collection weight log + GPS Method (Michelin Green Star-style 7-criterion sustainability scorecard, ~60-120 min): 1. Confirm the site + address; arrange a staff escort for back-of-house. 2. Photograph evidence for each criterion: sourcing, waste stream, energy, water, procurement records, seasonality, team practices. 3. Score each of the 7 criteria against the rubric with an evidence note. 4. For a waste audit, weigh or estimate food waste for one service and identify recovery/donation options. 5. Rank the highest-impact improvement recommendations. 6. Enter scores, evidence notes, waste data, recommendations, photos into the proof record; sign. Equipment: tablet/clipboard, camera, scale (waste weighing scope), 7-criterion rubric Done when: Score recorded for each of the 7 criteria with an evidence note; Food-waste weight/volume recorded (waste-audit scope); Recovery/donation options identified (waste scope); Ranked improvement recommendations + photos + address confirm
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify
Bring
- finished compost meeting the quality spec (temperature-cured; STA/US Composting Council tested where available)
- spreader, wheelbarrow + rakes/shovels at garden scale
- camera + GPS + tape/bucket for rate calibration
- gloves + dust mask for dry material handling
Steps
- 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
- 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
- 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
- 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
- 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.
If it does not match the plan
- Compost not finished (hot, ammonia smell, recognizable feedstock) -> reject the load; immature compost harms the soil it should build.
- Rain forecast that would wash material to a drain before incorporation -> delay application.
- Application area drains directly to a waterway with no buffer -> route to the conservation planner for a setback plan first.
What counts as done
- Application record complete: source, quality doc, quantity, rate, area, GPS, date
- Depth-check photos at ≥3 points match the planned rate
- No compost in gutters/drains/waterways (site-perimeter photo)
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.