Anyone can start here · Colusa Basin Drain, west of Maxwell, CA 95955

Hand-clear surface debris from the Colusa Basin Drain bank, site 2 -- Colusa Basin Drain, west of Maxwell, CA 95955 (2026-07-24)

Wind-blown trash and irrigation-pipe scraps pile up along this Colusa Basin Drain bank west of Maxwell, and every piece left there is one winter release away from damming the channel and backing tailwater into the surrounding rice fields. Standard: FEMA floodplain + green-infrastructure siting screen; SDG 11.5 disaster resilience. Proof: before/after photos + debris-volume log + dry-conditions confirm + GPS Method (FEMA floodplain + green-infrastructure siting screen; SDG 11.5 disaster resilience.): 1. 1. Walk the dry, accessible bank/road-shoulder edge of the Colusa Basin Drain under normal, non-storm/non-release conditions and photograph the debris as found. 2. 2. Hand-clear surface trash and debris (irrigation pipe scraps, bags, bottles, wind-blown litter) from the bank/shoulder, bagging it for haul-off. 3. 3. Never enter the drain channel itself or work during/after a release -- surface-edge clearing only, in dry conditions, from the accessible bank. 4. 4. Photograph the cleared bank edge from the matching before vantage and log the debris volume removed. Done when: before/after photos + debris-volume log + dry-conditions confirm + GPS

Where
Colusa Basin Drain, west of Maxwell, CA 95955
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + debris-volume log + dry-conditions confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-23

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.