Succ Civic Hazard
Repair the hazard the civic survey flags: Downtown pedestrian corridor, Fayetteville NC.
Bring the ramp or access point at Downtown pedestrian corridor, Fayetteville NC up to ADA/PROWAG grade now. Read all of it
Not funded yet. Settles as earned credit, $190 proposed.
Proof it takes, the deadline, the level
- Proofpermit + R304 measurement photos before/after + dome-panel install photos + GPS
- Open until2026-10-23
- Leveladvanced
All of it: the words, the place, the proof
Bring the ramp or access point at Downtown pedestrian corridor, Fayetteville NC up to ADA/PROWAG grade now. The civic hazard survey logged it with a named repair handoff. The ramp or access point fails ADA grade, with its slope, landing or warning surface outside the limits.
Fund it for $190. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Trained crew only: permit, 811 locates, wet-cut dust controls, pedestrian detour maintained; never work from the traffic lane. Wear eye and hearing protection, gloves, closed-toe shoes and a hi-vis vest near traffic.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + cones/barricades + pedestrian detour signage
- smart level / digital inclinometer + tape measure
- concrete tools + detectable warning surface (truncated dome) panel per city standard
- wet-cut saw with water feed (dust control)
- bucket (to water-test the gutter flow line)
Steps
- 1. ASSESS: measure the existing ramp against PROWAG R304 (running slope ≤8.3%, cross-slope ≤2%, landing, flush transition, detectable warning) and photograph each failure; confirm permit + utility locates before cutting.
- 2. Set up cones/barricades and a safe pedestrian detour outside the work zone.
- 3. Remove the failed ramp section with wet-cut dust controls; form and place the corrected ramp geometry per the city standard drawing.
- 4. Set the detectable warning surface (truncated domes) aligned and embedded per spec; finish transitions flush with the gutter.
- 5. VERIFY: re-measure every R304 dimension with the smart level, photograph readings + before/after from matching vantage, water-test the gutter flow line, and close out the permit.
What counts as done
- Before measurements photographed against R304 limits
- Permit + 811 locate references
- After measurements (slope/cross-slope/landing) photographed on the level
- Detectable-warning panel installation photos + flush gutter transition water test
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage, plus one Vealth service fee of 10% shown apart; the worker is paid the whole wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784867570537_ih7c9ir","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1784867570537_ih7c9ir