Succ Weatherization Readiness
Seal the drafts the weatherization survey finds: family home, Arleta, Los Angeles CA.
Seal the drafts around trim, doors, and penetrations with caulk and weatherstripping at family home, Arleta, Los Angeles CA. Read all of it
Not funded yet. Settles as earned credit, $105 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos per location + continuous-caulk-bead confirm + weatherstrip compression check + door/window function check
- Open until2027-07-24
- Levelintermediate
All of it: the words, the place, the proof
Seal the drafts around trim, doors, and penetrations with caulk and weatherstripping at family home, Arleta, Los Angeles CA. This is occupant-safe work: no combustion and no lead-paint work, and the weatherization-readiness check is what found them. Gaps around the window trim, doors and wall penetrations let air leak through. For the payer: - Price: $105 per job, counted in penetrations sealed. - Likely payer: LADWP rebate programs, paid to the account holder after the program's pre-approval. - No license is needed while the whole job, labor and materials together, stays under $1,000 (Business and Professions Code section 7048); at $1,000 or more, a CSLB C-2 Insulation and Acoustical license.
Fund it for $105. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Start after the crew's safety orientation. STOP on any building built before 1978, schools and public buildings included: do not scrape, sand or cut out old caulk or paint, send it to an EPA RRP firm, and assume lead until a lead inspector says otherwise. Also STOP at old caulk, putty or texture in a pre-1981 building until asbestos is ruled out, and never seal a gas appliance vent or make-up air, a fire-rated wall, or any wiring that looks like knob and tube; wear boots and nitrile gloves.
The full safety list for this job:
- Tightening a combustion-air or venting path near a gas appliance, water heater, or fireplace is a backdraft and carbon-monoxide risk.
- Fix active moisture, mold, or rot at an opening before sealing it in.
- STOP on a pre-1978 home with peeling or chipping paint at the work surface, route to an EPA RRP lead-safe certified pro, and never scrape it yourself.
- Never tighten a combustion-air or venting path near a gas appliance, water heater, or fireplace.
- Look up the year built (county assessor) before the visit and photograph the record. Caulk laid over sound paint with no scraping is allowed work on a pre-1978 building; removing old caulk, planing a sticking door or touching window sash friction surfaces is a lead job. Gas wall furnaces, floor furnaces and atmospheric water heaters are common in LA bungalows: where one is present, keep to exterior doors, test the CO alarm, and have a combustion safety test done by a BPI analyst before sealing walls or the attic floor. Fire-rated walls and ceilings (party walls in duplexes and fourplexes, rated corridors, shaft walls at schools and annexes) take a listed firestop system, never plain caulk: photograph and report them instead. Never foam or caulk over knob and tube conductors, and never seal a dryer or bath fan duct, crawlspace foundation vents or attic vents. Use paintable acrylic latex or acrylic silicone on trim that will be painted and 100 percent silicone only where it will not be painted; buy caulk labeled to meet SCAQMD Rule 1168. Gaps over a quarter inch get backer rod first, and weep holes in window frames stay open. Attics and closed rooms in summer follow the heat plan; run the same water, cool rest and buddy checks in an attic as outdoors.
- First-day orientation in plain words: this site's hazards, who to call, where first aid is, who can stop the job (Title 8 sections 3203 and 1509).
- No scraping, sanding, heat gun or dry cutting of paint; assume lead in any building built before 1978 until a certified test says otherwise; wet wipe and HEPA vacuum only (Title 8 section 1532.1).
- In buildings built before 1981 old caulk, glazing putty, texture, flooring and pipe wrap may hold asbestos; do not cut, scrape or sand them until a lab test or the owner's asbestos record says none; asbestos work of 100 square feet or more needs a Cal/OSHA registered contractor (section 341.6) (Title 8 section 1529).
- Training before use, three points of contact, ladder level and footed, never the top step or top cap (Title 8 sections 3276 and 1675).
- Outlet and switch gaskets: breaker off and tested dead with a non-contact tester before any plate comes off; skip any box with cracked, cloth-covered or aluminum wiring (Title 8 Electrical Safety Orders).
- Water, shade or a cool room, rest breaks, watch each other for heat signs; shade above 80 F and high-heat steps at 95 F outdoors (Title 8 section 3395 outdoors and section 3396 indoors).
- Exterior sealing when the air quality index is 151 or more: monitor, tell the crew, offer respirators (Title 8 section 5141.1).
- Gear, Title 8 sections 3385 and 3384: slip-resistant closed-toe shoes for stepping up to reach and dropped tools; nitrile gloves for caulk, foam sealant and solvents.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- non-contact voltage tester
- CO alarm or personal CO monitor for the visit
- HEPA vacuum and damp wipes for cleanup
- backer rod in quarter, three-eighths and half inch
- acrylic latex and acrylic silicone caulk labeled to meet SCAQMD Rule 1168
- N95 for dust (voluntary use, Appendix D to section 5144)
- stepladder rated for the work, fiberglass near electrical
- painter's tape and plastic sheeting for floors
- year-built printout and a one-page go or no-go card (lead, asbestos, gas appliance, fire door, wiring, ladder)
Steps
- Obtain two things in writing before any work: the owner's or manager's consent for this work at this address, and, when an LADWP rebate pays for it, the rebate pre-approval with the pre-approval photos taken as the program asks. Work done before the pre-approval can be ineligible, so the start waits for it. Write both at the top of your proof.
- Before any work, walk the building: note every gas appliance, test the CO alarm, mark labeled fire doors and any rated wall, and note cloth-covered or knob and tube wiring. Leave those places alone and report them.
- Photograph each draft location (window trim, door, outlet, penetration) before sealing.
- Look up the year built and photograph the record. Before 1978 assume lead on every painted surface and stop before any work that would disturb paint: do only work that does not touch paint (a new bead over sound caulk and intact paint, a sweep screwed into the door bottom) or hand the job to an RRP-certified firm. A lead test counts only if a certified inspector, risk assessor or renovator ran it.
- Post-1978 and asbestos-cleared only: cut out failed caulk and wipe clean. Pre-1978: stop, or an RRP-certified renovator removes it wet under plastic with a HEPA vacuum.
- Gaps over a quarter inch get backer rod first. Caulk only fixed joints, never a moving sash joint, and do not cover weep holes. Apply a continuous bead and tool it smooth within the skin time.
- Install weatherstripping on operable window/door edges so it compresses without binding the sash/door.
- Fit door sweeps to exterior doors. Before any outlet or switch plate comes off to fit a foam gasket, turn the circuit off at the breaker and test the box dead; skip and report any box with cracked, cloth-covered, aluminum or scorched wiring.
- Verify each treated opening closes/latches and the seal is continuous; photograph the finished work.
- Enter locations sealed, materials used, before/after photos, and any flagged hazard into the proof record; sign.
What counts as done
- Before and after photos of each sealed location
- Continuous caulk bead on fixed gaps and weatherstripping that compresses without binding
- Door sweeps and outlet gaskets installed on exterior openings/walls as scoped
- Every treated door/window still closes and latches after sealing
- Photo of the year-built record.
- Photo of the paint condition at each opening before work (the lead gate).
- Photo of the CO alarm test.
- After photos show no bare scraped wood, paint chips, caulk over a window weep hole or a vent, or a bead with gaps or no adhesion on both sides.
- Each before and after photo is taken from the same vantage, with the same count.
- Consent: the owner's or manager's written consent, naming the address and the work, dated before the first photo.
- Pre-approval first: the LADWP rebate program's pre-approval or reservation number and date, from before any work, or the words 'no rebate' when none is claimed.
- Completion matches the pre-approval: the pre-work photos taken for it, and the completion measurements (linear feet sealed and the gaps treated) that match what the program approved.
- Sign-off: the owner or manager signs off the finished work in writing, and LADWP's completion review accepts the record when a rebate pays for it. Write who signed and the date, or the date you asked.
- Photos: take the before photo and the after photo from the same point (stand where the first one was taken and match its frame), each with its GPS point and its date and time.
- Label: photograph the product label or package (make, type, size) and write the installed quantity: linear feet sealed.
Proof is measured against these, not judged by taste.
The standard this serves
DIY Weatherization and Air Sealing. Air sealing is the cheapest energy work there is, and the Department of Energy has spent decades proving it: a tube of caulk and a roll of weatherstrip, placed where the cold actually comes in, beat almost any gadget you can buy. This standard keeps the work occupant-safe: no wiring, no combustion equipment, no disturbing old paint. Mastery looks like hands that can find a draft with a bare palm and close it for good. This packet is one home's worth of that: find the gaps, seal them, photograph the proof.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage, plus one Vealth service fee of 10% shown apart; the worker is paid the whole wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784869195044_1x9z1b8","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.