FM 1761 corridor, unincorporated Willacy County colonia public road, near Raymondville, TX 78580
Hand-clear surface debris from a public roadside drainage ditch on FM 1761, site 1, FM 1761 corridor, unincorporated Willacy County colonia public road, near Raymondville, TX 78580.
A worker in gloves stays on the dry ditch top at FM 1761 corridor, hand-clearing trash, bottles and downed brush into bags until the colonia road's ditch edge runs clear for the after photo. Read all of it
Not funded yet. Settles as earned credit, $95 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + debris-volume log + dry-conditions confirm + GPS
- Open until2026-10-23
- Levelentry
All of it: the words, the place, the proof
Hand-clear surface debris from a public roadside drainage ditch on FM 1761. Wind-blown trash and brush pile up along this public roadside ditch on the FM 1761 colonia corridor, and every piece left there is one Rio Grande Valley downpour away from backing flat-land floodwater across the unpaved road and into nearby yards.
Fund it for $95. The receipt lands onchain once the proof is approved.
Safety, read before you claim
No special training is needed. Use hand tools only (grabber, gloves, bags) from the dry, accessible ditch top, and never enter standing or moving water or work during or right after a storm; wear a hi-vis vest near traffic.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Walk the dry, accessible top of a public roadside drainage ditch along FM 1761 under normal, non-storm conditions and photograph the debris as found.
- 2. Hand-clear surface trash and vegetation blockage (bags, bottles, wind-blown litter, downed brush) from the ditch top, bagging it for haul-off.
- 3. Never enter standing or moving water in the ditch, and never work during or right after a storm, surface-edge clearing only in dry conditions.
- 4. Photograph the cleared ditch edge from the matching before vantage and log the debris volume removed.
What counts as done
- Before photo of the littered ditch top
- Debris-volume log (approximate bags/lbs removed)
- Confirmation the visit occurred in dry, non-storm conditions
- After photo of the cleared ditch edge from the matching vantage
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage, plus one Vealth service fee of 10% shown apart; the worker is paid the whole wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784883879162_s3rstxv","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1784883879162_s3rstxv