Anyone can start here · 25 Mile Ave and Park Ave corridor, Hereford, TX 79045 (public right-of-way)

Hand-clear surface debris from a public roadside drainage ditch on the 25 Mile Ave corridor, site 1, 25 Mile Ave and Park Ave corridor, Hereford, TX 79045 (public right-of-way) (2026-07-24)

Wind-blown trash and tumbleweed pile up along this public roadside ditch in Hereford, and every piece left there is one High Plains downpour away from backing water across the road, in a flat farm-and-feedlot town with hard, wind-driven weather swings. Standard: FEMA floodplain + green-infrastructure siting screen. SDG 11.5 disaster resilience. Proof: before/after photos + debris-volume log + dry-conditions confirm + GPS Method (FEMA floodplain + green-infrastructure siting screen. SDG 11.5 disaster resilience.): 1. 1. Walk the dry, accessible top of a public roadside drainage ditch along the 25 Mile Ave or Park Ave corridor under normal, non-storm conditions and photograph the debris as found. 2. 2. Hand-clear surface trash and wind-blown tumbleweed or brush blockage from the ditch top, bagging it for haul-off. 3. 3. Never enter standing water in the ditch, and never work during high-wind or dust-storm conditions, surface-edge clearing only in calm, dry conditions. 4. 4. Photograph the cleared ditch edge from the matching before vantage and log the debris volume removed. Done when: before/after photos + debris-volume log + dry-conditions confirm + GPS

Where
25 Mile Ave and Park Ave corridor, Hereford, TX 79045 (public right-of-way)
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + debris-volume log + dry-conditions confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-23

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.