intermediate work · public playa-lake basin, Hereford town edge, Deaf Smith County, TX 79045
Plant native recharge grass at the edge of a public playa-lake basin, site 1, public playa-lake basin, Hereford town edge, Deaf Smith County, TX 79045 (2026-07-24)
This playa basin's edge is bare and eroding, weakening the very recharge-wetland function that lets rain soak down to refill the Ogallala Aquifer beneath a High Plains town that depends on it for both drinking water and irrigation. Standard: EPA green-infrastructure inspection, bioretention/bioswale/permeable-pavement function + maintenance, and in the Southern High Plains, native playa-basin recharge-wetland function. SDG 6.3/11.5. Proof: land-manager siting confirm + before/after photos + species/count record + edge-length record + GPS Method (EPA green-infrastructure inspection, bioretention/bioswale/permeable-pavement function + maintenance, and in the Southern High Plains, native playa-basin recharge-wetland function. SDG 6.3/11.5.): 1. 1. Confirm the basin's public access point with the city or county land manager and photograph the bare/eroding edge of the playa basin before planting. 2. 2. Prepare the edge by hand (clear weeds/debris, loosen soil) without disturbing the basin's natural clay-pan floor or any drainage inlet. 3. 3. Plant a native prairie grass mix suited to playa-edge recharge function at the design spacing around the basin's rim. 4. 4. Water in and photograph the finished planting from the matching before vantage, recording species/count and the length of edge planted. Done when: land-manager siting confirm + before/after photos + species/count record + edge-length record + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.