intermediate work · public drainage tributary of the Neches River, Diboll town edge, Angelina County, TX

Plant a native riparian buffer strip at Diboll's town-edge tributary, site 2, public drainage tributary of the Neches River, Diboll town edge, Angelina County, TX (2026-07-24)

This public drainage tributary's bank carries bare, eroding soil with no buffer planting to slow runoff or filter sediment before it reaches the Neches River. Standard: Urban-creek riparian restoration INSTALL (USDA NRCS CPS 391 riparian forest buffer + EPA nonpoint-source BMP practice) -- native buffer planting, bank stabilization, invasive/litter removal along a public creek or drainage reach in the Neches River basin. The hands-on DOING sibling of stream_bioassessment / watershed_health surveys. SDG 6.6 & 15.1. Proof: land-manager siting confirm + before/after photos + species/count record + GPS Method (Urban-creek riparian restoration INSTALL (USDA NRCS CPS 391 riparian forest buffer + EPA nonpoint-source BMP practice) -- native buffer planting, bank stabilization, invasive/litter removal along a public creek or drainage reach in the Neches River basin. The hands-on DOING sibling of stream_bioassessment / watershed_health surveys. SDG 6.6 & 15.1.): 1. 1. Confirm the buffer-strip location with the county or city land manager along the tributary's public reach, and photograph the bare bank before planting. 2. 2. Prepare the planting strip by hand, clearing turf/weeds without disturbing the existing bank soil structure. 3. 3. Plant a native riparian buffer mix (grasses, forbs, and shrubs) at the design spacing along the bank top, staying off any saturated ground. 4. 4. Water in and mulch the strip; photograph the finished planting from the matching before vantage and record species/count. Done when: land-manager siting confirm + before/after photos + species/count record + GPS

Where
public drainage tributary of the Neches River, Diboll town edge, Angelina County, TX
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
land-manager siting confirm + before/after photos + species/count record + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-23

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–180 minutes. Method of record: Urban-creek riparian restoration install (native buffer planting, bank stabilization, invasive/litter removal) per NRCS CPS 391 riparian forest buffer + EPA nonpoint-source BMP practice -- hands-on restoration, not a bioassessment survey; assess->clear->plant/stabilize->verify

Bring

Steps

  1. 1. Walk the reach with the site plan (or the standing bioassessment/watershed-health finding, if one exists) and photograph the bank/buffer segment as found: bare soil, invasive cover, litter, erosion.
  2. 2. Clear invasive growth and litter from the planting zone by hand, bagging trash separately from green waste; leave native volunteers in place.
  3. 3. Plant native riparian species (or set willow stakes / erosion-control matting) at the spacing and depth the site plan calls for, working from the top of bank downward; water each planting in.
  4. 4. Stake or anchor any erosion-control matting so it will not lift in the next high-flow event, and mulch around new plantings kept clear of stems.
  5. 5. Photograph the finished segment from the matching vantage, record species/count or matting area installed, and note any follow-up watering the planting needs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.